Procurement Timeline for a 1 MW Commercial Solar Project: From RFQ to Delivery

Amir OboudiAmir Oboudi·October 11, 2026·6 min read
Share:X / TwitterFacebook
Procurement Timeline for a 1 MW Commercial Solar Project: From RFQ to Delivery

Buying equipment for a megawatt-scale solar project follows a predictable sequence. Here is an outline of the steps, decision points and what to have ready at each.

How do you procure equipment for a 1 MW solar project?

Work through a sequence: define the design and specs, issue an RFQ, shortlist and verify suppliers, test samples, negotiate and sign the contract, pay in stages, inspect before shipment, ship and clear customs, and accept the goods on site. Doing the early steps carefully usually saves more time than rushing to the order.

The sequence

1. Define the design and specs

Fix module power class and technology, inverter type and size, racking, interconnection, and the balance of system. See module technology, inverters, racking and the BOS checklist.

2. Issue the RFQ

State specs, quantity, Incoterm, delivery date, documents required and quote deadline. See how to write an RFQ and use the RFQ form.

3. Compare quotes on a landed basis

Convert currencies, add freight, duties and fees, and compare price per watt. See comparing prices and currency risk.

4. Verify the shortlist

Check company details, references, documents and take a factory tour. See verifying a supplier.

5. Order a sample

Check the product against the datasheet. See ordering samples.

6. Negotiate and sign the agreement

Agree specs, delivery, acceptance, warranty and remedies. See key clauses.

7. Pay in stages

Deposit, milestone and balance tied to evidence. See deposit and balance.

8. Inspect before shipment

Independent pre-shipment check before you release the balance. See pre-shipment inspection.

9. Ship, clear customs and deliver

Plan transport, insurance and import clearance. See freight and importing into Canada.

10. Accept on site

Check counts, damage and documents, and run the agreed acceptance tests. Keep records for warranty claims. See handling claims.

Approximate durations

Durations depend on the supplier, season and market, so ask for written schedules. As a planning aid, treat design and RFQ as weeks, supplier verification and samples as weeks, production and shipping as the longest block, and customs and delivery as days to weeks. Order long-lead items first. See planning around lead times.

Where TradYard fits

Use B2B listings and the shop for specs and prices, supplier profiles and live tours for verification, an RFQ for quotes, and the Deal Room for agreements and staged payments.

Frequently Asked Questions

How many suppliers should I quote?

Three to five qualified suppliers is a common range.

When should I order the inverters?

As soon as the design is fixed, if their lead time is long compared with the modules.

Can I split the order across suppliers?

Yes, but check compatibility and take responsibility for integration.

Do I need an independent inspection?

For a project of this size, it is a sensible precaution.

What documents do I keep?

Contract, datasheets, certificates, test and inspection reports, shipping documents and acceptance records.

Share:X / TwitterFacebook
Amir Oboudi

Written by

Amir Oboudi

October 11, 2026

Stay in the Loop

Get weekly market insights, auction alerts, and expert tips delivered to your inbox.

Unsubscribe anytime. No spam.