We use cookies that are needed to sign you in and keep your cart. With your permission we also use Google Analytics to learn how the site is used and Google Ads to measure our advertising. You can change your mind at any time. Read the privacy policy

Skip to main content
BlogGuidesSolar Balance-of-System Equipment: A Checklist for DC Cables, Connectors and Combiner Boxes

Solar Balance-of-System Equipment: A Checklist for DC Cables, Connectors and Combiner Boxes

Amir OboudiAmir Oboudi·September 17, 2026·6 min read
Share:X / TwitterFacebook
Solar Balance-of-System Equipment: A Checklist for DC Cables, Connectors and Combiner Boxes

The balance of system is everything in a solar project except the panels, inverters and racking. Missing or mismatched parts delay projects, so here is a practical checklist.

What is balance-of-system equipment in solar?

Balance of system (BOS) is everything a solar plant needs besides the modules and inverters: cables, connectors, combiner boxes, disconnects, fuses and breakers, grounding, conduit, monitoring and communication equipment, and the racking that holds it all. BOS items are individually cheap and collectively critical, because one wrong or missing part can hold up a whole installation.

The checklist

DC cables

  • Cable type rated for solar DC use and for outdoor sun exposure.
  • Conductor size and voltage rating that suit the string current and the voltage drop you can accept.
  • Lengths ordered with allowance for routing and waste.

Connectors

  • Connector type compatible with the module leads. Mixing brands is a known source of faults, so use matched pairs or confirmed compatible parts.
  • Crimping tools and spare connectors.

Combiner boxes and disconnects

  • Number of inputs and the current and voltage rating that match your strings.
  • Fusing, surge protection and the enclosure rating for the environment.
  • DC and AC disconnects that meet local code and are accessible for maintenance.

Grounding and protection

  • Grounding conductors, lugs and bonding hardware for modules and racking.
  • Surge protective devices where required.

Monitoring

  • Meters, data loggers and weather sensors if you need performance reporting.
  • Communication cables and network equipment.

Compatibility is the real risk

Ask your designer for a bill of materials with part numbers, and have it checked against the module and inverter datasheets. Check that voltage and current ratings leave margin for cold-weather voltage rise, which matters in Canadian winters. See choosing an inverter and racking.

Certifications and documents

Electrical parts should carry the certifications your inspector requires. Ask for datasheets and certificates before you buy. See what to ask for.

Spares and delivery

Order a small percentage of spares for connectors, fuses and cable, and check the packing list on arrival. Staged deliveries can match the construction schedule. See a procurement timeline for a 1 MW project.

Buy the small parts too

Many TradYard suppliers list electrical components alongside modules and inverters. Browse the shop and B2B listings, or ask for a full package quote with an RFQ that includes your bill of materials.

Frequently Asked Questions

Can I mix connector brands?

It is discouraged. Use matched connectors or parts confirmed compatible by the manufacturers.

Do I need a combiner box?

It depends on the design. Many string inverters take strings directly, while larger arrays often use combiners.

How much spare BOS should I order?

Ask your installer. A small allowance for connectors, fuses and cable is common.

What cable size do I need?

It depends on current, length and allowed voltage drop. Have your designer calculate it.

Is monitoring necessary?

Not required, but it helps you detect faults and prove performance.

Share:X / TwitterFacebook
Amir Oboudi

Written by

Amir Oboudi

September 17, 2026

Stay in the Loop

Get weekly market insights, auction alerts, and expert tips delivered to your inbox.

Unsubscribe anytime. No spam.